Уул уурхайн барилга байгууламж

MDFE Concentrator factory complex

Захиалагч
MDFE LLC
Байршил
Mongolia, Dundgovi province, Undurshil soum
Үйлчилгээ
Complete detailed design drawing, government approvals, construction supervision and state commissioning

Construction planning:

  1. The construction size of the Concentrating Plant: Metal structure of one floor above Level ± 0.00, with axial dimensions of 102.0 m x 63.0 m, 30.0 m x 14.7 m, with no basement below Level ± 0.00, is planned.

The exterior of the Plant will include a basketball court, sidewalk, parking lot, and greenery.

1st floor: Storage room, watering section, boiler room, water treatment room, electrical distribution room, control room, water storage tank room, manager room, low voltage room, and diesel generator room are planned respectively.

  1. The construction size of the Grinding Mill: Metal structure of one floor above Level ± 0.00, with axial dimensions of 78.0 m x 10.0 m, 8.5 m x 4.5 m, with no basement below Level ± 0.00, is planned.

1st floor: Electrical room and crusher section are planned.

  1. The construction size of the Workers’ Camp:

The metal structure of one floor above Level ± 0.00, with axial dimensions of 84.6 m x 25.5 m and 5.7 m x 32.4 m, with no basement below Level ± 0.00, is planned.

1st floor:  Hall, basement, male staff room, kitchen, bathroom, shower, dining room, female staff room, amenities room for 1-2 people, auxiliary kitchen room, staff bathroom, VIR room, thermal station, doctor’s room, security gatehouse, offices, and conference rooms are planned respectively.

  1. The size of the Workshop:

The metal structure of only one floor above Level ± 0.00, with axial dimensions of  31.3 m x 10.7 m, with no basement below Level ± 0.00, is planned.

1st floor: The workshop/workroom, generator room, and boiler room are planned, respectively.

  1. The size of the Chemical Warehouse:

The metal structure of one floor above Level ± 0.00, with axial dimensions of  30.0 m x 10.0 m, with no basement below Level ± 0.00, is planned.

1st floor: A chemical warehouse and a technical room are planned, respectively.

  1. The construction size of the Medium size Wastewater Treatment Plant: Metal structure of one floor above Level ± 0.00, with axial dimensions of 8 m x 4.4  m, with a basement below Level -4.56, is planned.

 

Ground floor: Examination room, bio-reactor section, sedimentation tank chamber, disinfection section are planned, respectively.

1st floor: Supervision and control room is planned.

  1. The construction sizes of Weigh Bridge, Plant’s security post and Camp security post: Metal structure of one floor above Level ± 0.00, with axial dimensions of 5 m x 3.5 m, 4.8 m x 3.8 m, 4.5 m x 3.0 m, with no basement below Level ± 0.00, is planned.

1st floor:  Weighbridge (measurement) room, security room, amenities room are planned, respectively.

Уул уурхайн барилга байгууламж
Дээш