Construction planning:
The exterior of the Plant will include a basketball court, sidewalk, parking lot, and greenery.
1st floor: Storage room, watering section, boiler room, water treatment room, electrical distribution room, control room, water storage tank room, manager room, low voltage room, and diesel generator room are planned respectively.
1st floor: Electrical room and crusher section are planned.
The metal structure of one floor above Level ± 0.00, with axial dimensions of 84.6 m x 25.5 m and 5.7 m x 32.4 m, with no basement below Level ± 0.00, is planned.
1st floor: Hall, basement, male staff room, kitchen, bathroom, shower, dining room, female staff room, amenities room for 1-2 people, auxiliary kitchen room, staff bathroom, VIR room, thermal station, doctor’s room, security gatehouse, offices, and conference rooms are planned respectively.
The metal structure of only one floor above Level ± 0.00, with axial dimensions of 31.3 m x 10.7 m, with no basement below Level ± 0.00, is planned.
1st floor: The workshop/workroom, generator room, and boiler room are planned, respectively.
The metal structure of one floor above Level ± 0.00, with axial dimensions of 30.0 m x 10.0 m, with no basement below Level ± 0.00, is planned.
1st floor: A chemical warehouse and a technical room are planned, respectively.
Ground floor: Examination room, bio-reactor section, sedimentation tank chamber, disinfection section are planned, respectively.
1st floor: Supervision and control room is planned.
1st floor: Weighbridge (measurement) room, security room, amenities room are planned, respectively.